Description
This powerflush procedures form is designed for and fully compatible for use with ServiceM8.
This form takes you and your staff through all 20 steps of a powerflush process so your team are guaranteed to cover everything.
Next Steps
- Place your order
- I’ll drop you a line to request your ServiceM8 account details
- I’ll upload your new form into your ServiceM8 account and run through the testing process.
Please Note
You’ll need a ServiceM8 account with the ‘Forms’ add-on activated to use this product.
This form includes the following details:
- If system is vented, cap off the cold feed and expansion pipe
- Connect Clearflow pump into heating system.
- Open all radiator valves
- Switch on Clearflow pump
- Set one Clearflow valve into the dump position
- Adjust inlet water valve
- Set Clearflow into circulation mode
- Remove tank cap and add power flush
- Switch on boiler to heat water
- Continue circulation
- Close all radiator valves
- Shut off first radiator
- Switch to dumping on last radiator
- Operate flow reverser
- Open up previous radiator
- Re-open all radiator valves
- Add neutralising crystals
- Commence final dump
- Test that dump water is neutral
- Circulate for ten minutes